Livestock handling facility – Part 2

Once a few posts were in position we were ready for the rails.

rails-small

Most of the rails had to be drilled and were then secured in place with 200mm coach screws.

impact-wrench-medium

It was difficult to achieve nice even curves with straight rails but with careful consideration and some cutting

cutting-small

we were achieving the desired shape.

auger-2-small

With the outside of the pen completed the crush (used to secure individual animals while being examined) had to be lifted into position.

crush-small

The remaining posts were put in and all rails attached.  All the gates were hung and the facility was completed.

gate-small

The team

Advertisements

One thought on “Livestock handling facility – Part 2

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s