More work to complete the cabin

We currently have internet, but I do not know how long for.

I was at the cabin last weekend to work on the inside of the veranda that I built last year.  It was hot work as the temperature is still around 30 degrees C.

The walls and ceiling needed more insulation  and then the hole veranda needed to be lined with chipboard.   Here is how an interior wall looked before I started.

20140802_121622 (Medium)

I have screwed joists to the inside of the walls and put insulation between the joists.  The insulation was then covered with a bitumen coated paper.

20140802_151856 (Medium)

In this picture was can see that the ceiling is completed and most of the wall.

20140803_201354 (Medium)

After so much bird activity at the cabin over the last few weeks, there is now an ire silence as all the birds have now left on there migration south.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s