Out-building completed

Once the planks were cut to go up on the walls, and delivered

panels on lorry

I could start putting up the first layer

panels going up

with a 75mm gap between each plank.

panels first layer

Then the outer layer was put on, with each plank placed over the 75mm gap (each plank was 125mm wide)

outbuilding-1

I have also mounted a sliding door on the front

sliding door

and a couple of windows in the sides (these are old windows from the cabin)

outbuilding-3

Inside I am using all the remaining off-cuts to build shelving

shelving

So apart from some fiddly little jobs left to do, the out-building is completed!!

One thought on “Out-building completed

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s