Finishing touches to out-building

So last weekend I worked on the finishing touches to the out-building.

I have fixed up a metal sill over the sliding door mechanism

door guard

and used camping insulation mat screwed along both the front and back edge of the door to form a wind and snow seal, but the flexibility of the mat still allows the door to opened and closed

door seal

The sills over and under the windows are in place now

window guards

and metal trim around the roof

side view

Inside, I made more shelving;

for tools and equipment

shelving-2

for timber

wood store

for work clothing and spare parts to machinery

storage

and a loft where we can keep skis and larger items

platform

On Sunday I even had time to go and saw up some Birch that I had felled in the spring.

cut birch

 

 

One thought on “Finishing touches to out-building

  1. Really good building, well done, you should be proud of the work. Roll on December when you move, looking forward to seeing more progress.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s